Nebraska Parkway from Southwood to 27th

Project Summary

This project will replace 5,800 feet of existing water mains in the area of Nebraska Parkway from Southwood Drive to 27th Street. Construction will take place along the following streets:

  • Stockwell Street from Woods to Pace boulevards
  • Pace Boulevard from Woods Boulevard to Stockwell Street
  • Woods Boulevard from Pace Boulevard to 27th Street
  • Nebraska Parkway from Southwood Drive to 27th Street

Project Location

Funding

Schedule

Construction is expected to take place in 2025.

Access During Construction

Lane closures will be required in the project area during construction.