This project will replace 5,800 feet of existing water mains in the area of Nebraska Parkway from Southwood Drive to 27th Street. Construction will take place along the following streets:
Construction is expected to take place in 2025.
Lane closures will be required in the project area during construction.
Tim McCarthy, Design Engineer City of Lincoln, LTU Project Delivery tmccarthy@lincoln.ne.gov