“O” from Sun Valley to 1st - Water Main Abandonment

Project Summary

This project will abandon the existing 8-inch water main along “O” Street from Sun Valley Boulevard to 1st Street.

Project Location

Funding

Schedule

Construction is anticipated to take place in 2027.

Access During Construction

Lane closures in the street and sidewalk closures will be needed to facilitate construction.

Project Contacts

  • Craig Aldridge, Design Engineer
    City of Lincoln, LTU Design, Development and Construction
    caldridge@lincoln.ne.gov
    402-416-5349

  • Andy Walker, Superintendent of Water Distribution
    Lincoln Water System
    awalker@lincoln.ne.gov
    402-432-5304