This project will abandon the existing 8-inch water main along “O” Street from Sun Valley Boulevard to 1st Street.
Construction is anticipated to take place in 2027.
Lane closures in the street and sidewalk closures will be needed to facilitate construction.
Craig Aldridge, Design Engineer City of Lincoln, LTU Design, Development and Construction caldridge@lincoln.ne.gov 402-416-5349
Andy Walker, Superintendent of Water Distribution Lincoln Water System awalker@lincoln.ne.gov 402-432-5304