This project will construct a water distribution main along Saltillo Road from 40th to 54th streets.
Construction is anticipated to take place in 2028.
David Tull, Design Engineer City of Lincoln, Transportation and Utilities dtull@lincoln.ne.gov 402-441-7711
Raitis Tigeris, Project Manager Lincoln Water System rtigeris@lincoln.ne.gov 402-525-3285