This project included installation of a 16" water main on the north side of Van Dorn Street from 98th Street to a proposed roundabout at 103rd Street.
Construction took place from late summer 2024 to spring 2025.
Craig Aldridge, Design Engineer Lincoln Transportation and Utilities caldridge@lincoln.ne.gov 402-416-5349
Russ Gasper, Construction Engineer Lincoln Transportation and Utilities rgasper@lincoln.ne.gov 402-580-8438
Andy Walker, Superintendent of Water Distribution Lincoln Water System awalker@lincoln.ne.gov 402-432-5304