This project will extend the water main along West Holdrege Street from Chitwood Lane to Woodside Village Drive.
Raitis Tigeris, Project Manager Lincoln Water System rtigeris@lincoln.ne.gov 402-525-3285
Craig Aldridge, Design Engineer City of Lincoln, Transportation and Utilities caldridge@lincoln.ne.gov 402-416-5349