Woods Blvd • Pace Blvd • Stockwell Street - Water Main Replacement

This project will replace water mains along the following streets:

  • Stockwell Street from Woods Boulevard to 27th Street
  • Pace Boulevard from Woods Boulevard to Stockwell Street
  • Woods Boulevard from Pace Boulevard to 27th Street

Project Location

Funding

Schedule

Construction is expected to take place in 2026.

Access During Construction

Construction may require closure of streets and sidewalks in the work area.

Project Contact

  • David Tull, Design Engineer
    City of Lincoln, Transportation and Utilities
    dtull@lincoln.ne.gov
    402-890-9658