This project is located at the intersection of North 84th Street and College Park Drive. Construction may begin and/or end approximately 500 feet beyond the intersection in all four directions.

Purpose and Need

The purpose of this project is to replace the existing traffic signal at the intersection of North 84th Street and College Park Drive. The project is needed to remove infrastructure that has exceeded its expected lifespan, bring the intersection control into conformance with current traffic signal practices, and to meet current City of Lincoln guidelines and specifications. Pedestrian and trail crossings will also be improved to meet current guidelines.

Stay informed with project updates via text
LTU works to share up-to-date project information in a quick and easy way that assists you with planning your day. To receive project updates, please opt-in now.
Learn More About TextLNK

Scope of Work

The improvements consist of replacing traffic signal poles and related signal infrastructure at the intersection. Curb ramps and adjacent incidental pavement and sidewalk will be reconstructed to meet current standards. Grading may be required for the entire length of this project depending on the extent of the curb ramp and incidental sidewalk/trail replacement. Further ground disturbance will occur for the installation of the signal poles, signal cabinet pad, pull boxes, and conduits.

Project Location & Trail Detour

 PDF Map (PDF, 39KB)

  • Project Area
  • Phase 1 & 2 Trail Detour Phase 1 & 2 Trail Detourr
  • Phase 3 Trail Detour Phase 1 & 2 Trail Detourr
  • Existing 84th Street Bike Trail

Right-of-Way

The projects will require the acquisition of additional property rights, which could include new right-of-way (ROW), control of access (CA), permanent easements (PE), and/or temporary easements (TE). If your property is impacted by this project, you will be contacted by a representative once the design footprint has been established. Access to adjacent properties will be maintained during construction but may be limited at times due to phasing requirements.

Construction Schedule

Construction is taking place in 2025.

Accommodation of Traffic

This project will be constructed under traffic with lane closures controlled by appropriate traffic control devices and practices. Traffic detours will not be necessary to install the traffic signals.

Potential Impacts

The 84th Street Trail will be detoured during reconstruction of the associated curb ramps. The detour route will involve crossing North 84th Street at Vine Street or “O” Street for different phases. Pedestrian access to and from Southeast Community College to North 84th Street will be maintained through construction phasing. See the map, above, for the proposed 84th Street Trail detour routes.

Estimated Costs

The estimated cost of the 84th & College Park Traffic Signal project is $760,600. Funding would derive from federal and local funding sources.

Project Contact

  • Jess Sundeen, Construction Project Manager
    City of Lincoln, LTU Project Delivery
    jsundeen@lincoln.ne.gov
    402-416-5341

  • Russ Gasper, Construction Engineer
    City of Lincoln, LTU Project Delivery
    rgasper@lincoln.ne.gov