This project would rehabilitate the 14th Street bridge over Salt Creek and replace the 14th Street bridges over Oak Creek and Cornhusker Highway. The project would also replace the existing traffic signal at 14th and Adams streets.
Construction is tentatively planned to begin in 2030.
Construction would be completed under lane closures for the rehabilitation work on the Salt Creek bridge and signal reconstructtion at Adams Street. Construction would require a full closure for the bridge reconstruction work over Oak Creek and Cornhusker Highway.
Pedestrian access may be limited during bridge rehabilitation work over Salt Creek and signal reconstructtion work at Adams Street. Pedestrian access would be closed during bridge reconstruction work over Oak Creek and Cornhusker Highway.
Craig Aldridge, Design Engineer City of Lincoln Transportation and Utilities caldridge@lincoln.ne.gov 402-416-5349