This project will improve Cotner Boulevard between “O” and Starr streets through a mill and overlay of the asphalt surface and replacement of concrete in the area. Existing traffic signals at Cotner & Holdrege and Cotner & Starr will be replaced with new traffic signals. A side path has been proposed on Cotner Boulevard from “R” Street to North 66th Street.
Project Funding
Schedule
The project is currently in design. Construction is tentatively planned for 2027.
Access During Construction
Street closures will be necessary during construction.