This project will improve residential streets in the Eastborough Neighborhood:
Additional work includes upgrades to the existing curb ramps to comply with the Federal Americans with Disabilities Act (ADA) requirements.
Design is expected to be completed by late 2025 and construction is anticipated to take place in 2026.
Streets will be closed to through traffic during construction. Local access will be maintained to the extent possible.
Sidewalks and curb ramps will be closed during reconstruction. Sidewalk access will be maintained for pedestrians on at least one side of the street.
Ryan Leeper, Design Engineer City of Lincoln, Transportation and Utilities rleeper@lincoln.ne.gov 402-890-3126
Russ Gasper, Construction Engineer City of Lincoln, Transportation and Utilities rgasper@lincoln.ne.gov 402-580-8438