This project will improve Nebraska Parkway between 14th and 27th streets. Work includes a mill and overlay of the existing lanes, reconstruction of the outside eastbound lane from 20th Street to approximately 750' west, and installation of a new signal at the Southwood Drive intersection.
Construction is anticipated to take place in 2027.
It is anticipated that the project will be constructed with head-to-head, two-way traffic on one side while the other side is under construction.
Ryan Leeper, Design Engineer City of Lincoln, Transportation and Utilities rleeper@lincoln.ne.gov 402-890-3126
Russ Gasper, Construction Engineer City of Lincoln, Transportation and Utilities rgasper@lincoln.ne.gov 402-580-8438