Safety Enhancement Plan for 7811 Pioneers Boulevard Driveway

Project Summary

This project will install yellow vertical delineators (flexible posts) along the street centerline to eliminate left-turn conflicts while maintaining right-in/right-out (RIRO) access for adjacent businesses on the south side of Pioneers Boulevard.

Project design showing location of flexible posts along Pioneers Boulevard at the intersection of the driveway at 7811 Pioneers Boulevard(, 0B)

Project Location

Project Funding

Schedule

Construction is expected to take place in fall of 2026. Work is estimated to take one week to be completed.

Access During Construction

Lane closures will be required during construction.