The 2023 Residential PressurePave Project was completed as part of Lincoln's Pavement Preservation Program. This project preserved almost 3.5 miles of residential streets in the neighborhoods surrounding Lincoln Northeast High School and Brownell Elementary School. The following streets were included:
Work included filling the existing voids and sealing all of the cracks in the asphalt. A 1/4-inch wearing surface was then applied to the prepared surface. This product addresses streets that have deteriorated past the point of an asphalt rejuvenation but are not in poor enough condition to require a mill and overlay. Each PressurePave application should delay the need for a more costly mill and overlay by at least 10 years or more. Minor repairs by City Street Maintenance crews and/or the contractor prior to the PressurePave application are also included.
Watch: 2022 PressurePave Project Completed Project & Construction Process
Construction took place in summer 2023.
City of Lincoln, Asset Management and Performance Email: zbecker@lincoln.ne.gov Phone: 402-613-3763
Donelson Construction Company Email: bdonelson@cleverstone.com Phone: 417-848-3117