This project will repair selected sections of sidewalk in the area of 56th and 70th streets from Old Cheney Road to Pioneers Boulevard. The project includes 64 locations of sidewalk repair and ADA ramp reconstruction.
Individual repair locations will be within the general project area.
Construction will occur in 2024.
Due to the nature of work, there may be times areas are closed to pedestrians.
Russ Gasper, Construction Engineer City of Lincoln, LTU Project Delivery rgasper@lincoln.ne.gov 402-580-8438
James Puls, Construction Project Manager City of Lincoln, LTU Project Delivery jpuls@lincoln.ne.gov 402-525-5641