This project includes sidewalk repair and ADA ramp reconstruction at locations throughout the neighborhood in the area of South Coddington Avenue and West “A” Street.
Individual repair locations will be within the general project area.
Construction is anticipated to take place in 2026.
Danielle Vachal, Design Engineer City of Lincoln Transportation and Utilities dvachal@lincoln.ne.gov 531-289-8211