2025 Sidewalk Program Report

Investing in Safety and Walkability

Lincoln’s sidewalk program made great strides in 2025, repairing and improving sidewalks at a rate unmatched in recent years. Thanks to increased funding, the City accelerated its pace of work, driving an 85 percent increase in locations repaired and extending improvements across more neighborhoods.

2025 Project Map

Map representing locations of sidewalk improvement projects in 2025

Project Square Feet Repaired Locations Improved
City Council District 1 Sidewalks 10,955 sq ft 39
City Council District 2 Sidewalks 16,625 sq ft 58
City Council District 3 Sidewalks 9,981 sq ft 35
City Council District 4 Sidewalks 15,078 sq ft 75
Citywide Reimbursement Program 48,945 sq ft 208
University Place Sidewalks 17,000 sq ft 65
StarTran Sidewalk & Bus Stop Improvements 16,424 sq ft 44
Citywide Sidewalk Mitigation 11,985 linear ft 27.84 mi
*Totals: 135,008 sq ft 524

By the Numbers

$2.6 million invested in 2025*

These investments:

  • Improve mobility
  • Support neighborhood infrastructure
  • Increase accessibility for all residents

In 2025, Lincoln repaired more than twice the sidewalk surface area compared to 2024.

Square Feet Repaired

Graph representing 52,167 square feet of sidewalks repaird in 2024 and 135,008 square feet of sidewalks repaird in 2025

From 2024 to 2025, Lincoln nearly doubled sidewalk location improvements and installed more than 2½ times more ramps that meet Americans with Disabilities Act (ADA) standards.

Locations Improved

Graph representing 282 locations improved in 2024 and 524 locations improved in 2025

Ramps Installed

Graph representing 38 ramps installed in 2024 and 100 ramps installed in 2025

Types of Work

Reimbursement

Eligible sidewalk improvements include mud jacking to level uneven slabs and full panel replacement for damaged sections. (More info below.)

Citywide Sidewalks

Crews are replacing damaged sections across Lincoln, focusing on sites from the lengthy repair waiting list to improve walkability and access.

StarTran + Sidewalks

Our Sidewalk and StarTran teams are working together to repair sidewalks and install ramps near select bus stops, improving ADA access for riders.

Sidewalk Mitigation

By sawing/grinding uneven panels, crews reduce trip hazards, making neighborhood sidewalks safer for everyone.

Reimbursement Program

Lincoln’s sidewalk reimbursement program empowers property owners to improve walkability in neighborhoods. When funds are available, residents can hire a contractor to repair qualifying sidewalk sections and receive reimbursement from the City.

In 2025, the City increased the reimbursement rate for full sidewalk panel replacement from $6 to $10 per square foot, helping better reflect current construction costs. Mud jacking remains reimbursable at up to $3 per square foot.

As of early August, the City has doubled partipication in the reimbursement program, processing more than 200 reimbursements.

Reimbursement Program Participation

Graph representing 98 locations improved in 2024 and 208 locations improved in 2025, with a sharp increase in the dollar amount invested

What’s Ahead

The sidewalk program will continue to grow in 2026, with $3 million budgeted for next year’s improvements. Upcoming priorities include:

  • Advancing high-priority ADA improvements
  • Responding to neighborhood repair needs
  • Improving connectivity near schools, transit, and trails

*Data as of August 5, 2025