27th from Saltillo to Rokeby Water Main Installation

Project Summary

This project would construct a new water main along the proposed South 27th Street alignment, which is currently in the grade study phase and could connect to the Jamaica Avenue and Saltillo Road roundabout. There is no planned paving or sidewalk work with this water main project.

Project Location

Funding

Schedule

Construction is anticipated to take place in 2026.

Access During Construction

There is no planned paving or sidewalk work with this project. Minimal street and driveway impacts are expected.

Project Contacts

  • Ryan Leeper, Design Engineer
    City of Lincoln Transportation and Utilities
    rleeper@lincoln.ne.gov