This project would construct a new water main along the proposed South 27th Street alignment, which is currently in the grade study phase and could connect to the Jamaica Avenue and Saltillo Road roundabout. There is no planned paving or sidewalk work with this water main project.
Construction is anticipated to take place in 2026.
There is no planned paving or sidewalk work with this project. Minimal street and driveway impacts are expected.
Ryan Leeper, Design Engineer City of Lincoln Transportation and Utilities rleeper@lincoln.ne.gov 402-890-3126