35th and Calvert Area Water Main Replacement and Abandonment

Project Summary

This project includes water main replacements and abandonments in the area near 35th and Calvert streets. Work will take place along the following streets:

  • Calvert Street from 33rd to 37th streets
  • 35th Street from Calvert Street to dead end
  • Hillside Street from 33rd to 35th streets
  • Hillside Circle
  • Merritt Drive
  • 38th Street from Calvert Street to Sheridan Boulevard
  • Woodbine Avenue from Calvert Street to Sheridan Boulevard

Project Location

Funding

Schedule

Construction is anticipated to take place in 2027.

Access During Construction

Street and sidewalk closures will be necessary to facilitate construction.

Project Contacts

  • Tim McCarthy, Design Engineer
    City of Lincoln, LTU Design, Development and Construction
    tmccarthy@lincoln.ne.gov
    402-770-0463

  • David Tull, Design Engineer
    City of Lincoln, LTU Design, Development and Construction
    dtull@lincoln.ne.gov
    402-890-9658