This project includes installation of a water distribution main along the Saltillo Road corridor from 38th to 40th streets.
Construction is anticipated to take place 2027.
David Tull, Design Engineer City of Lincoln, Transportation and Utilities dtull@lincoln.ne.gov 402-441-7711
Raitis Tigeris, Project Manager Lincoln Water System rtigeris@lincoln.ne.gov 402-525-3285