This project will replace the existing water mains along 48th Street from Normal to Cotner.
Work is being coordinated with a street improvement project in the same area.
Construction is expected to take place in 2026.
A full closure of 48th Street from Normal Boulevard to Sumner Street will be required for the water main replacement. Additional lane closures on 48th Street, Normal Boulevard and South Street will be required to facilitate construction. Local access and emergency services access will be maintained at all times.
Mark Miller, Construction Project Manager City of Lincoln, Transportation and Utilities mmiller@lincoln.ne.gov 402-416-5348
Russ Gasper, Construction Engineer City of Lincoln, Transportation and Utilities rgasper@lincoln.ne.gov 402-580-8438
Andy Walker, Superintendent of Water Distribution City of Lincoln Water System awalker@lincoln.ne.gov 402-441-5921