This project will replace the existing water mains along 48th Street from Normal to Cotner.
Construction is anticipated to take place in 2025.
The project will require lane closures during construction on 48th Street.
Craig Aldridge, Design Engineer City of Lincoln, LTU Project Delivery caldridge@lincoln.ne.gov 402-416-5349
Dave Beyersdorf, Superintendent of Water Distribution City of Lincoln Water System dbeyersdorf@lincoln.ne.gov 402-441-5932