Visitors are encouraged to review updated parking options due to construction.
This project will replace the existing water mains along 48th Street from Normal to Cotner.
Work is being coordinated with a street improvement project in the same area.
Construction is anticipated to take place in 2026.
Lane closures on 48th Street, Normal Boulevard and South Street will be required to facilitate construction. A full closure of 48th Street south of South Street will be needed for 10-14 days. Local access and emergency services access will be maintained at all times.
Craig Aldridge, Design Engineer City of Lincoln Transportation and Utilities caldridge@lincoln.ne.gov 402-416-5349
Andy Walker, Superintendent of Water Distribution City of Lincoln Water System awalker@lincoln.ne.gov 402-441-5921