Adams Street from 38th to 49th Streets Street Improvements Project

Location

Identified as Adams Street from 38th to 49th Streets, this project will improve approximately one mile of Adams Street between 38th and 49th streets. Construction may begin and/or end approximately 50 feet ahead of or beyond the actual project limits to accommodate transitioning the pavement.

Purpose and Need

The purpose of this project is to preserve and extend the service life of the transportation asset, enhance the reliability of the transportation system, and perpetuate the mobility of the traveling public. The need for this project is based on information from the City of Lincoln’s Planning and Programming Division.

Scope of Work

The project includes concrete replacement and repairs, grading, milling, and resurfacing of the street. It also includes reconstruction of pedestrian ramps, curbs and gutters, and replacing the pedestrian crossing signal near North 46th Street to increase safety for pedestrians and vehicles.

This work is being coordinated with a water main replacement project on Adams Street from 36th to 41st Streets. Phasing of the work will take place following and concurrently with the phasing of the water main work. More info: Water Main Replacement Project

Project Location

Right of Way

Access to adjacent properties will be maintained during construction but may be limited at times due to traffic phasing requirements. In addition, utility coordination will be necessary on this project as pole relocation is anticipated this summer in the limits of street widening.

Funding

Schedule

Construction is scheduled to take place from spring 2025 to early 2026.

Access During Construction

Work will require temporary full closures through each phase of the project. The designated detour will utilize Cornhusker Highway, US Highway 6, 48th Street, Fremont Street, 56th Street and Leighton Avenue. Project Detour Map (, 0B)

Temporary sidewalk closures will be necessary during construction of curb ramps, including the sidewalks within the 48th and Adams Street Mini Park. Access to the remaining Mini Park areas will also be limited during construction. The John Dietrich Trail will need to be detoured along existing sidewalks during reconstruction of the trail crossing between 39th and 40th streets. Trail Detour Map (, 0B)

Community Involvement

Pre-construction Open House
Wednesday, May 14, 2025
4:30 to 6:30 p.m.
First United Methodist Church, 2723 North 50th Street
Meeting information Project Fact Sheet (, 0B) Meeting Displays (, 0B)
Project Design Open House
Thursday, May 19, 2022
5 to 7 p.m.
First United Methodist Church, 2723 North 50th Street
Meeting information

Project Contacts

  • James Puls, Construction Project Manager
    City of Lincoln, LTU Project Delivery
    jpuls@lincoln.ne.gov
    402-525-5641

  • Russ Gasper, Construction Engineer
    City of Lincoln, LTU Project Delivery
    rgasper@lincoln.ne.gov
    402-580-8438