This project included sidewalk repair and ADA ramp reconstruction at selected locations in the Crown Pointe Neighborhood.
Individual repair locations took place within the general project area.
Construction took place in 2025.
Tyler Lacey, Project Representative City of Lincoln, LTU Transportation tlacey@lincoln.ne.gov 402-430-5995