The purpose of this project was to preserve the transportation asset, improve the reliability of Lincoln’s transportation system, and ensure the mobility of the traveling public. The need for this project was based on the condition of the pavement.
This project improved the pavement along Holdrege Street from 47th to 70th streets, not including the intersections of 56th Street or Cotner Blvd.
The improvements:
Improved roadway conditions, as necessitated by the pavement age and condition;
Widened Holdrege Street between 67th and 70th streets by one foot, per Nebraska Board of Public Roads Classifications and Standards; and
Brought the project area’s curb ramps into compliance with the Americans with Disabilities Act.
The project was completed in segments, starting at 47th Street and progressing east to 70th Street.
Construction took place in 2020.
JEO Consulting Group Email: bciecior@jeo.com 402-525-1953
MTZ Construction Phone: 402-890-7063