Note: The test kit must be held at the same level as the assembly being tested. All needle valves and bleed valves on the test kit must be closed, and flush cocks must be flushed before testing.
Differential pressure across the check must be 1.0 psi or above.
Air inlet must begin to open at 1.0 PSI or above and must fully open at atmospheric pressure.